Practice Set — Part 1 (Q1–Q8)
(a) Outlier Fences: Calculate \(\text{IQR} = Q_3 - Q_1 = 76 - 48 = 28\).
Lower fence: \[Q_1 - 1.5(\text{IQR}) = 48 - 1.5(28) = 48 - 42 = \mathbf{6}.\]
Upper fence: \[Q_3 + 1.5(\text{IQR}) = 76 + 1.5(28) = 76 + 42 = \mathbf{118}.\]
(b) Outlier Status: Since \(4 \lt 6\), 4 is a low outlier. Since \(122 \gt 118\), 122 is a high outlier.
Mean: Affected by both multiplication and addition: \[\bar{x}_F = 1.8(25.0) + 32 = 45.0 + 32 = \mathbf{77.0^{\circ}\text{F}}.\]
Standard Deviation: Affected ONLY by multiplication, not by the addition of 32: \[s_F = 1.8(s_C) = 1.8(4.0) = \mathbf{7.2^{\circ}\text{F}}.\]
There are \(22\) participants in Lab 1 (\(12 + 10\)), of whom \(12\) recorded Positive, giving \(\frac{6}{11}\). Verification: confirm row, axis scale, and boundary values directly from the visual and check intermediate arithmetic. Final Answer: \(\frac{6}{11}\)
(a) Slope Interpretation: For each additional 1 percentage point increase in homework completion, the model predicts an average increase of 0.55 points on the exam.
(b) \(r^2\) Calculation & Interpretation: \[r^2 = (0.82)^2 = 0.6724 = \mathbf{67.24\%}.\] Exactly 67.24% of the variability in exam scores is explained by the linear relationship with homework completion percentage.
(a) Residual: Predicted score: \[\hat{y} = 38.0 + 0.55(80) = 38.0 + 44.0 = 82.0.\] Residual: \[e = y - \hat{y} = 86 - 82.0 = \mathbf{+4.0\text{ points}}.\] The student scored 4.0 points higher than predicted by the regression line.
(b) Residual Plot Adequacy: A residual plot showing random scatter with no discernible curve, fanning, or systematic pattern confirms that a linear model is appropriate and that error variance is approximately constant.
Reading the left and right edges of the box on the scale gives \(Q_1 = 14\) and \(Q_3 = 21\), so \(\text{IQR} = 21 - 14 = 7\). Verification: confirm row, axis scale, and boundary values directly from the visual and check intermediate arithmetic. Final Answer: \(7\)
Summing bar heights directly from the histogram gives \(6 + 6 + 9 + 4 = 25\). Verification: confirm row, axis scale, and boundary values directly from the visual and check intermediate arithmetic. Final Answer: \(25\)
Total probability sums to \(1\), so \(c = 1 - \frac{2+2+2}{10} = \frac{2}{5}\). Verification: confirm row, axis scale, and boundary values directly from the visual and check intermediate arithmetic. Final Answer: \(\frac{2}{5}\)
